Clogging by material of the 70 extractions of the silo. Loss of storage capacity: 1000 tonnes of material clogged in a 5000-tonne silo.
Complete emptying of the silo
- First step: Use of pneumatic POWERNET to evacuate the extractions
- Second step: Intervention by 2 pneumatic GIRONETs to evacuate the material
Recovery of all of the storage capacity of the silo.