Accumulation of material in the transition chute between secondary screen and conveyor to the transition point.
Installation of declogging system AIRCHOC® AC51010SDP DN 100 mm, 50 liters, allowing free flow of the material in the chute.
Following many production stoppages due to build-ups in the chute, it was decided to proceed with automation of its declogging with the AIRCHOC® system and ensure a continuous flow of the chromium ore.