Build-ups in the riser ducts leading to production stops.
Raw Meal (future clinker and then cement)
To remove the concretions that disrupt the industrial process and reduce the production capacity.
Installation of 4 MACSYS Wireless: 2 MACSYS Wireless with 8 heads DN100 + 2 MACSYS Wireless with 5 heads DN100
No more kiln shutdowns related to blockage of the riser ducts