In the transition section from round to rectangle above the discharger, bran build-ups occur on a regular basis to full blockage of the extraction and therefore the production output.
Bridging occurs from the beginning of the cone to the discharge.
Following a technical study, Standard Industrie proposed to place 4 Airchoc® air cannons on the silo.