Mineral extraction

Chrome industry and extraction

PROBLEM:

Accumulation of material in the transition chute between secondary screen and conveyor to the transition point.

Unclogging system on ore chute

SOLUTION :

Installation of declogging system AIRCHOC® AC51010SDP DN 100 mm , 50 liters , allowing free flow of the material in the chute.

RESULT:

Further to many production stoppages due to the build-ups in the chute, it was decided to proceed with automation of its declogging with the AIRCHOC® system and ensure a continuous flow of the chromium ore.


Call

Contact